Coal and Mining Sector

[pib] PRAKASH  Portal

Note4Students

From UPSC perspective, the following things are important :

Prelims level : PRAKASH portal

Mains level : Not Much


The Union Minister of State for Power and New & Renewable Energy (IC) has launched PRAKASH (Power Rail Koyla Availability through Supply Harmony) portal.

PRAKASH Portal

  • PRAKASH Portal is developed by NTPC and sources data from different stakeholders such as Central Electricity Authority (CEA), Centre for Railway Information System (CRIS) and coal companies.
  • The Portal aims at bringing better coordination for coal supplies among all stakeholders viz – Ministry of Power, Ministry of Coal, Coal India, Railways and power utilities.
  • This is an important step in ensuring adequate availability and optimum utilization of coal at thermal power plants.
  • The Portal is designed to help in mapping and monitoring entire coal supply chain for power plants, viz –
  1. Coal Stock at supply end (mines),
  2. Coal quantities/ rakes planned,
  3. Coal quantity in transit and
  4. Coal availability at power generating station.
  • All reports are available in PDF/Excel format. However, to present information in a user friendly method, the Portal gives graphical representation of reports with details shown on the map of India.

Benefits of Portal to the Stakeholders

The portal makes available following information on a single platform –

  • Coal company will be able to track stocks and the coal requirement at power stations for effective production planning
  • Indian Railways will plan to place the rakes as per actual coal available at siding and stock available at power stations.
  • Power stations can plan future schedule by knowing rakes in pipe line and expected time to Reach.
  • Stock at power generating station
  • Ministry of Power /Ministry of Coal/ CEA/ POSOCO can review overall availability of coal at thermal power plants in different regions
Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments