💥Mains Ready By December. Smash Mains & Smash PYQ Admissions Open

GS Paper: Government Scheme/Policies

  • Digital Push in Rural India: eGramSwaraj & SabhaSaar Milestones

    Why in the News?

    The Ministry of Panchayati Raj announced major milestones:

    • ₹3 lakh crore digital payments via eGramSwaraj
    • SabhaSaar AI tool expanded to 23 Indian languages

    These developments strengthen digital governance and transparency in rural India.

    What is eGramSwaraj?

    • Digital platform for Gram Panchayat governance
    • Part of e Panchayat Mission Mode Project
    • Integrated with Public Financial Management System (PFMS)

    What is SabhaSaar? 

    • AI powered voice to text meeting summarisation tool
    • Launched: 14 August 2025
    • Used for Gram Sabha meetings
    [2017] Local self-government can be best explained as an exercise in: (a) Federalism (b) Democratic decentralization (c) Administrative delegation (d) Direct democracy
  • PM-KUSUM 2.0 and Battery Storage Integration

    Why in the News?

    On March 28, 2026, the Central Government announced the extension of timelines for existing projects under the PM-KUSUM scheme. Simultaneously, the Ministry of New and Renewable Energy (MNRE) revealed that it is formulating PM-KUSUM 2.0, which may feature a major technical shift: the inclusion of Battery Energy Storage Systems (BESS).

    Need for Battery Storage in PM-KUSUM 2.0

    The primary driver for incorporating battery storage is the divergence between solar power availability and agricultural load patterns:

    • Load Demand: Agricultural power demand typically rises in the morning and remains steady throughout the day, often persisting after sunset.
    • Solar Generation: Peaks around noon and tapers off sharply toward the evening.
    • The Solution: BESS will store surplus solar power generated during peak sunlight hours to be used when generation falls but irrigation demand continues, thereby improving grid stability and ensuring reliable daytime power for farmers.
    • Policy Debate: The Ministry of Power has suggested up to four hours of battery storage, while the MNRE has proposed a two-hour capacity for the initial rollout.

    What is PM-KUSUM?

    • Launched in March 2019, PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan) is a flagship scheme of the Ministry of New and Renewable Energy (MNRE). 
    • Its primary goal is to provide energy security to Indian farmers while de-dieselizing the agricultural sector and increasing farmers’ income through solar power.

    Current Progress of PM-KUSUM (as of Feb 2026)

    While the target was 34.8 GW by March 2026, the actual implementation has been slower:

    ComponentTarget/ObjectiveProgress (Approx. Feb 2026)
    Component A10,000 MW Decentralized Solar Plants839.4 MW installed
    Component BStandalone Solar Pumps (Off-grid)Over 10 lakh pumps installed
    Component CSolarization of Grid-connected Pumps6,636.9 MW total (IPS + FLS)
    Total Progress34.8 GW (Target)12,164 MW (Actual Installed)
    [2024] Consider the following: 
    1 Battery storage 
    2 Biomass generators 
    3 Fuel cells 
    4 Rooftop solar photovoltaic units 
    How many of the above are considered “Distributed Energy Resources”? 
    (a) Only one (b) Only two (c) Only three (d) All four
  • UDAN Scheme Revamp: Subsidy Extended to 5 Years 

    Why in News

    The Union Cabinet approved a revamped UDAN scheme with ₹28,840 crore outlay, extending airline subsidies and shifting funding to government budget support.

    About UDAN Scheme

    • Full form: Ude Desh ka Aam Naagrik
    • Launched: 2017
    • Ministry: Civil Aviation
    • Objective:
      • Improve regional connectivity
      • Make air travel affordable
      • Develop Tier 2 and Tier 3 airports

    Key Changes in Revamped UDAN

    1. Subsidy Extended

    • Earlier subsidy period: 3 years
    • New subsidy period: 5 years
    • Purpose:
      • Improve route viability
      • Prevent route discontinuation

    2. Funding Shift

    • Earlier: Subsidy funded through levy on airfares
    • Now: Subsidy funded directly from government exchequer

    Why Revamp Was Needed

    • Many routes became non viable after subsidy ended
    • CAG findings: Only 7% to 10% routes viable after subsidy
    • Status of routes:
      • Total routes launched: 663
      • Routes discontinued: 327
    • Airports revived: Total: 95
      • Discontinued: 15 airports
    [2024] Consider the following airports: 
    1 Donyi Polo Airport 
    2 Kushinagar International Airport 
    3 Vijayawada International Airport 
    In the recent past, which of the above have been constructed as Greenfield projects? (a) 1 and 2 only (b) 2 and 3 only (c) 1 and 3 only (d) 1, 2 and 3
  • PM Surya Ghar Muft Bijli Yojana 

    Why in the News

    • Government shared progress of rooftop solar installation under the scheme in Parliament.

    Key Achievements

    • 25.87 lakh rooftop solar (RTS) systems installed across India
    • Coverage: Both rural and urban households
    • Beneficiaries: 32.02 lakh households (as of March 16, 2026)

    About the Scheme

    • PM Surya Ghar Muft Bijli Yojana
    • Launched: February 2024
    • Aim:
      • Promote rooftop solar adoption
      • Provide free/subsidised electricity to households
      • Reduce electricity bills
    [2025] Consider the following statements about ‘PM Surya Ghar Muft Bijli Yojana’: 
    1. It targets installation of one crore solar rooftop panels in the residential sector. 
    2. The Ministry of New and Renewable Energy aims to impart training on installation, operation, maintenance and repairs of solar rooftop systems at grassroot levels. 
    3. It aims to create more than three lakhs skilled manpower through fresh skilling and up-skilling, under scheme component of capacity building. 
    Which of the statements given above are correct? 
    (a) I and II only (b) I and III only (c) II and III only (d) I, II and III
  • Jal Jeevan Mission & Sujal Gaon ID

    Why in the News

    The government has launched Sujal Gaon ID for digital mapping of rural water schemes.

    • Approved Jal Jeevan Mission (JJM) 2.0 extension till Dec 2028.
    • Increased total outlay to ₹8.69 lakh crore.

    What is Sujal Gaon ID?

    • A unique digital ID for every rural piped water supply scheme
    • Enables end-to-end mapping (source → infrastructure → service area)
    • Integrated under “Sujalam Bharat” digital platform

    Key Facts

    • 1.64 lakh Sujal Gaon IDs created
    • Linked to 67,000 Sujalam Bharat IDs
    • Covers 31 States/UTs
    • Aim: Real-time monitoring, transparency, and accountability
    [2024] With reference to the Digital India Land Records Modernisation Programme, consider the following statements: To implement the scheme, the Central Government provides 100% funding. Under the Scheme, Cadastral Maps are digitised. An initiative has been undertaken to transliterate the Records of Rights from local language to any of the languages recognized by the Constitution of India. Which of the statements given above are correct? (a) 1 and 2 only (b) 2 and 3 only (c) 1 and 3 only (d) 1, 2 and 3

  • Vibrant Villages Programme Phase II launched to strengthen border areas 

    Why in the News?

    Union Home Minister Amit Shah launched Phase II of the Vibrant Villages Programme from Assam, aiming to develop border villages and curb migration and infiltration.

    Vibrant Villages Programme I

    Approval

    • Approved on 15 February 2023.
    • Centrally Sponsored Scheme.

    Coverage

    • 662 villages.
    • 46 blocks.
    • 19 districts.
    • States: Arunachal Pradesh, Himachal Pradesh, Sikkim, Uttarakhand.
    • UT: Ladakh.
    • Focused on northern border areas.

    Objectives

    • Livelihood generation through:
      • Tourism and cultural heritage.
      • Skill development and entrepreneurship.
      • Agriculture, horticulture, medicinal plants.
    • Infrastructure:
      • Road connectivity.
      • Housing and village infrastructure.
      • Renewable energy.
      • Telecom and TV connectivity.
    • Incentivise population to remain in border villages.

    Vibrant Villages Programme II

    Approval

    • Approved on 2 April 2025.
    • Central Sector Scheme.
    • Outlay: ₹6,839 crore till FY 2028-29.

    Coverage

    • Blocks abutting international land borders other than northern border.
    • Implemented in strategic villages across:
      • Arunachal Pradesh, Assam, Bihar, Gujarat.
      • J and K UT, Ladakh UT.
      • Manipur, Meghalaya, Mizoram, Nagaland.
      • Punjab, Rajasthan, Sikkim.
      • Tripura, Uttarakhand, Uttar Pradesh, West Bengal.

    Objectives

    • Better living conditions and livelihood opportunities.
    • Safe and secure borders.
    • Control trans border crimes.
    • Integrate border population as “eyes and ears” of border guarding forces.

    Thematic Saturation Areas

    1. All weather road connectivity.
    2. Telecom connectivity.
    3. Television connectivity.
    4. Electrification through convergence.
    [2015] The provisions in Fifth Schedule and Sixth Schedule in the Constitution of India are made in order to: (a) protect the interests of Scheduled Tribes 

    (b) determine the boundaries between States 

    (c) determine the powers, authority and responsibilities of Panchayats 

    (d) protect the interests of all border States

  • Police action on illegal rat-hole coal mining after court directions

    Why in the News?

    Police in Meghalaya have been directed by the judiciary to identify and act against owners of illegal rat hole coal mines, following repeated mining accidents and continued violations despite a long standing ban.

    What is Rat Hole Coal Mining?

    • Rat hole mining is a primitive and hazardous method of coal extraction where miners dig narrow horizontal or vertical tunnels, often just large enough for a person to crawl through.
    • This practice is mainly found in parts of Meghalaya due to unique land ownership patterns.

    Judicial Background

    • The National Green Tribunal banned rat hole coal mining in 2014. The ban was imposed due to
      • Severe environmental damage
      • Frequent loss of lives
      • Absence of safety standards

    Why Does Illegal Mining Continue?

    • Coal bearing land is often privately or community owned
    • Weak enforcement and local political economy
    • High demand for coal and informal labour
    • Difficult terrain and limited monitoring capacity
    [2018] How is the National Green Tribunal (NGT) different from the Central Pollution Control Board (CPCB)? 1. The NGT has been established by an Act whereas the CPCB has been created by an executive order of the Government

    2. The NGT provides environmental justice and helps reduce the burden of litigation in the higher courts whereas the CPCB promotes cleanliness of streams and wells, and aims to improve the quality of air in the country. 

    Which of the statements given above is/are correct? 

    (a) 1 only (b) 2 only (c) Both 1 and 2 (d) Neither 1 nor 2

  • Bharat Taxi 

    Why in the News?

    Union Minister for Home Affairs and Cooperation Amit Shah launched Bharat Taxi, India’s first cooperative based ride hailing platform, on 5 February 2026.

    About Bharat Taxi

    • India’s first cooperative led ride hailing platform
    • Registered under the Multi-State Cooperative Societies Act, 2002
    • Established on 6 June 2025
    • Conceptualised under the Ministry of Cooperation

    Core Philosophy

    • Drivers are called sarathis and are owners of the platform
    • Principle of sarathi hi malik meaning driver is the owner
    • Designed to free drivers from aggregator driven and commission based models

    Operational Model

    • Zero commission for drivers
    • Surge free pricing for passengers
    • Profits distributed directly to drivers
    • No exclusivity clause allowing drivers to work on other platforms

    Driver Welfare Measures

    • Personal accident insurance cover of ₹5 lakh
    • Family health insurance cover of ₹5 lakh
    • Retirement savings support
    • Dedicated driver support centres at seven locations in Delhi
    • Rapid emergency assistance and verified ride data

    Women Empowerment Initiative

    • Bike Didi programme for women drivers
    • Over 150 women drivers enrolled so far
    [2021] With reference to casual workers employed in India, consider the following statements: 1. All casual workers are entitled to Employees Provident Fund coverage

    2. All casual workers are entitled to regular working hours and overtime payment

    3. The government can, by notification, specify that an establishment or industry shall pay wages only through its bank account

    Which of the above statements are correct? 

    (a) 1 and 2 only (b) 2 and 3 only (c) 1 and 3 only (d) 1, 2, and 3

  • NAMASTE Scheme and Waste Pickers Enumeration Data 2026

    Why in the News?

    Ministry of Social Justice and Empowerment tabled data in Parliament on February 03, 2026 revealing the social profile of 1.52 lakh waste pickers enumerated under the NAMASTE Scheme across 35 States and Union Territories.

    Social Category Breakup

    • Scheduled Castes: 60.3 percent or 92,089
    • Scheduled Tribes: 10.5 percent or 16,077
    • Other Backward Classes: 13.7 percent or 20,954
    • General category: 10.7% or 16,329 workers

    State and UT Level  

    • Delhi and Goa show majority of waste pickers from General category
    • In Delhi, 4,289 of over 6,500 workers were from General category (65.9%)
    • In Goa, 729 of 1,286 workers were from General category (56.6%)
    • West Bengal recorded 42.4 percent General category waste pickers

    Related Data on Sanitation Workers

    • About 89,000 sewer and septic tank workers enumerated so far
    • 95.8 percent of them are men
    • 859 deaths reported due to hazardous sewer and septic tank cleaning since 2014
    • 43 deaths recorded in 2025 alone

    About NAMASTE Scheme

    • Implemented by the Ministry of Social Justice and Empowerment
    • Focuses on enumeration and formal recognition of waste pickers, sewer and septic tank workers
    • Provides protective equipment and safety measures
    • Aims to eradicate deaths due to hazardous sewer and septic tank cleaning
    [2016] ‘Rashtriya Garima Abhiyaan’ is a national campaign to: (a) rehabilitate the homeless and destitute persons and provide them with suitable sources of livelihood 

    (b) release the sex workers from their practice and provide them with alternative sources of livelihood 

    (c) eradicate the practice of manual scavenging and rehabilitate the manual scavengers 

    (d) release the bonded labourers from their bondage and rehabilitate them

  • To tackle India’s waste problem, new rules turn focus to source

    Why in the News

    The Union Ministry of Environment, Forest and Climate Change has notified the Solid Waste Management (SWM) Rules, 2026, superseding the Solid Waste Management Rules, 2016. The rules have been notified under the Environment (Protection) Act, 1986 and will come into full effect from April 1, 2026. They mark the first comprehensive shift towards source-level segregation, bulk generator accountability, and lifecycle tracking of waste. The scale of the problem is significant: India generates 1.85 lakh tonnes of solid waste daily, of which 1.14 lakh tonnes is processed or treated, while 39,629 tonnes are landfilled. Despite past rules, poor segregation and mounting legacy landfills persist, making the new framework a corrective response to systemic failures in urban waste governance.

    Why Were the 2016 Rules Replaced?

    1. Implementation fatigue: Limited compliance despite statutory mandates.
    2. Segregation failure: Continued mixing of biodegradable, recyclable, and hazardous waste.
    3. Landfill expansion: Aging dumpsites posing environmental and public health risks.
    4. Accountability gaps: Weak enforcement on residential societies and institutions.

    What Structural Shift Do the SWM Rules, 2026 Introduce?

    1. Source-based governance: Ensures segregation and processing before disposal.
    2. Waste hierarchy: Prevention, reduction, reuse, recycling, recovery, disposal as last resort.
    3. Lifecycle approach: Tracks waste from generation to final treatment.

    How Is Four-Way Segregation Operationalised?

    1. Dry waste: Plastics, paper, metals and other recyclables.
    2. Wet waste: Biodegradable household and food waste.
    3. Sanitary waste: Diapers, sanitary napkins, condoms.
    4. Special-care waste: Medicines, paint containers, household hazardous waste.

    Who Qualifies as a Bulk Waste Generator?

    1. Large buildings: Floor area of 20,000 sq m or more.
    2. High resource use: Water consumption of 40,000 litres/day or more.
    3. Energy-intensive units: Electricity generation of 100 kW/day or more.
    4. Institutions: Residential societies, malls, colleges, hotels and hospitals with 5,000 sq m area.

    What Obligations Apply to Bulk Waste Generators?

    1. Extended responsibility: Aligns generators with EPR-like accountability.
    2. On-site processing: Mandates composting or decentralised treatment of wet waste.
    3. Certification compliance: Requires proof of segregation and processing.
    4. Digital registration: Mandatory enrolment on the centralised portal.
    5. Annual reporting: Submission of returns by June 30, detailing quantities and certificates.

    How Does the Polluter Pays Principle Operate?

    1. Environmental compensation: Imposes penalties for non-segregation.
    2. Landfill pricing: Charges for sending mixed waste to landfills.
    3. Behavioural correction: Makes segregation economically preferable.

    How Does Digital Governance Strengthen Waste Management?

    1. Centralised online portal: Tracks generation, collection, transportation, processing, disposal, biomining and bioremediation.
    2. Unified registration: Enables online authorisation of waste facilities with local bodies and SPCBs/PCCs.
    3. Audit integration: Mandates audits of all waste processing facilities with reports uploaded digitally.
    4. Regulatory simplification: Replaces multi-step physical reporting with single-window digital compliance.

    How Do the Rules Enable Faster Land Allocation for Waste Infrastructure?

    1. Graded land-use criteria: Facilitates siting of waste processing facilities.
    2. Buffer zone mandate: Applies to facilities exceeding 5 tonnes per day capacity.
    3. CPCB guidelines: Specify buffer size and permissible activities based on pollution load.
    4. Infrastructure acceleration: Expedites land allocation by States and Union Territories.

    What Are the Revised Duties of Local Bodies and MRFs?

    1. Municipal responsibility: Ensures collection, segregation and transportation of waste.
    2. MRF recognition: Formalises Material Recovery Facilities as sorting and aggregation hubs.
    3. Multi-waste handling: Allows MRFs to act as deposition points for e-waste, sanitary and special-care waste.
    4. Carbon finance: Encourages urban local bodies to generate carbon credits.
    5. Peri-urban focus: Mandates special attention to rural areas adjoining cities.

    How Is Industrial Energy Transition Linked to Waste Management?

    1. Refuse Derived Fuel (RDF): Fuel derived from non-recyclable plastic, paper and textiles.
    2. Mandatory substitution: Requires cement plants and waste-to-energy units to replace solid fuel with RDF.
    3. Phased targets: Increases fuel substitution from 5% to 15% over six years.
    4. Circular economy: Converts waste into industrial energy input.

    How Are Landfilling Practices Restricted?

    1. Disposal limits: Restricts landfills to inert and non-recoverable waste.
    2. Higher landfill fees: Penalises local bodies for dumping unsegregated waste.
    3. Cost rationalisation: Makes segregation and processing cheaper than landfilling.
    4. Regulatory oversight: Mandates annual landfill audits by SPCBs.
    5. District supervision: Assigns monitoring responsibility to District Collectors.

    How Are Legacy Waste Dumpsites Addressed?

    1. Mandatory mapping: Requires identification and assessment of all legacy dumpsites.
    2. Time-bound remediation: Enforces biomining and bioremediation.
    3. Quarterly reporting: Tracks progress through the online portal.
    4. Volume reduction: Recovers usable material and reduces landfill mass.

    What Special Provisions Apply to Hilly Areas and Islands?

    1. Tourist user fees: Enables cost recovery for waste management.
    2. Inflow regulation: Aligns tourist numbers with waste handling capacity.
    3. Designated collection points: Ensures safe disposal of non-biodegradable waste.
    4. Decentralised processing: Requires hotels and restaurants to process wet waste locally.
    5. Anti-littering norms: Encourages community responsibility.

    What Institutional Mechanisms Support Implementation?

    1. Central and State Committees: Ensure coordinated execution of the rules.
    2. State-level leadership: Committees chaired by Chief Secretaries or UT heads.
    3. Advisory role: Recommend measures to the CPCB for effective enforcement.

    Conclusion

    The SWM Rules, 2026 reconfigure India’s waste governance by integrating source segregation, land-use planning, industrial energy transition, and digital oversight. By shifting responsibility upstream and embedding enforcement mechanisms, the rules seek to arrest landfill growth and institutionalise circular economy practices. Their effectiveness will depend on municipal capacity, compliance enforcement, and intergovernmental coordination.

    PYQ Relevance

    [UPSC 2018] What are the impediments in disposing the huge quantities of discarded solid wastes which are continuously being generated? How do we remove safely the toxic wastes that have been accumulating in our habitable environment?

    Linkage: This question directly tests challenges in solid waste management, landfill overload, and environmental pollution, core themes under GS-III. The Solid Waste Management Rules, 2026 provide the policy linkage by addressing impediments through source segregation, bulk waste generator accountability, biomining, and bioremediation of legacy waste.