Why in the News?
The Union Environment Ministry has cleared the 2,220 MW Oju Hydroelectric Project on the Subansiri River in Taksing, Upper Subansiri district, near the China border.
About the Oju Hydroelectric Project:
- Capacity & Location: A 2,220 MW run-of-river hydro project on the Subansiri River at Taksing, Upper Subansiri district, Arunachal Pradesh, near the China border.
- Infrastructure:
- Dam: 93 m high, 355 m long concrete gravity dam.
- Tunnels: Two diversion tunnels, 14.17 km headrace tunnel.
- Powerhouse: Underground, with 8 turbines of 231.25 MW each.
- Hydrology: Catchment area 9,827 sq. km; average annual yield 11,339 million cubic meters.
Significance of the Project:
- Hydro Cascade: Largest in Subansiri basin, upstream of projects like Niare, Naba, Nalo, Dengser, Upper & Lower Subansiri, making it vital for basin-wide energy planning.
- Border Security: Strengthens India’s strategic presence near China border through infrastructure development.
- Energy Security: Provides clean power at ~₹5.65/kWh, supporting renewable targets and reducing fossil dependence.
Back2Basics: Subansiri River
|
Get an IAS/IPS ranker as your 1: 1 personal mentor for UPSC 2024