Why in the News
Prior Gram Sabha consent for acquiring land in Scheduled Areas has moved from a step the Orissa High Court called only “directory”, meaning advisory, to a mandatory condition the State cannot skip. In Bibol Toppo versus Odisha government and others, a two-judge Bench of the Supreme Court set aside Odisha’s acquisition in Sundargarh district for limestone mining by Dalmia Cements Bharat Limited. The ruling tests whether mining needs can override a tribal community’s say over its land.
What does the 2013 land acquisition law require in Scheduled Areas?
- The law: The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (LARR Act) governs how the government takes private land for a public purpose. It works like a checklist the State must clear first.
- Why consent exists: Scheduled Areas are tribal-majority regions with special constitutional protection, so the Act gives their communities a direct say over acquisition.
- Section 41: The Act requires the prior consent of the Gram Sabha before land in a Scheduled Area is acquired.
- Consent of families: Acquisition for a private company also needs the consent of at least 80% of affected families. It is taken with the Social Impact Assessment (SIA), a study of the acquisition’s effect on local people.
- The takeaway: In tribal areas, acquisition is not a decision the State takes alone; the community must agree first.
What did the Supreme Court hold in the Sundargarh case?
- The challenge: Residents of Kukuda, Bihabandha and Lanjiberna villages challenged the Odisha government’s 2021 acquisition of their land for the company’s mining.
- Mining lease: The company held a mining lease over 893.55 hectares, extended until February 2040.
- Surface rights: It sought 273.57 hectares across the three villages for surface rights, the right to use the land surface for mining operations.
- High Court view: A 2024 Orissa High Court judgment upheld the acquisition, holding that prior consent did not apply because the State, not the company, was acquiring the land.
- Supreme Court finding: The Bench of Justices Dipankar Datta and Satish Chandra Sharma found the State had acted without the Gram Sabhas’ prior consent. It set aside the acquisition as “unsustainable”, with the related notifications and orders.
Why does the ruling matter for mining and tribal land rights?
- Compensation is not acquisition: A mining lessee cannot start mining by simply paying the occupier. It must first acquire the land under the 2013 Act.
- Two kinds of payment: The Court held that paying for loss or damage to land is not the same as paying to acquire it.
- State as acquirer: The State’s role as acquirer no longer lets it bypass Gram Sabha consent on behalf of a private miner.
Challenges
- Quality of consent: Gram Sabha consent can be obtained under pressure or with incomplete information, which weakens the community’s free choice.
- Delay and cost: Consent and the SIA lengthen acquisition timelines, raising costs for mining projects.
- Late remedy: The State proceeded without consent, and the villagers got relief only after reaching the Supreme Court.
Way Forward
- Public consent records: States should publish Gram Sabha resolutions and SIA reports before notifying any acquisition in a Scheduled Area.
- Independent recording: An independent officer should record Gram Sabha consent in the local language.
- Compliance review: States should review pending acquisitions in Scheduled Areas for compliance with Section 41.
Conclusion
Mining in Scheduled Areas now needs the community’s prior consent, not just a State decision and a compensation payment. What to watch is whether Odisha and other States re-run pending acquisitions with Gram Sabha consent and the SIA taken together.
Back2Basics: Scheduled Areas
- Constitutional basis: Article 244(1) and the Fifth Schedule govern the administration of Scheduled Areas and Scheduled Tribes in States other than Assam, Meghalaya, Tripura and Mizoram.
- Declaration: The President declares an area a Scheduled Area by order.
- Governor’s role: The Governor reports to the President on the administration of these areas and can direct that a law does not apply or applies with changes.
- PESA link: The Panchayats (Extension to the Scheduled Areas) Act, 1996 (PESA) extends panchayats to these areas and requires the Gram Sabha or panchayat to be consulted before land acquisition.
Matching Previous Year Question
“[2012] In the areas covered under the Panchayat (Extension to the Scheduled Areas) Act, 1996, what is the role/power of Gram Sabha? 1. Gram Sabha has the power to prevent alienation of land in the Scheduled Areas. 2. Gram Sabha has the ownership of minor forest produce. 3. Recommendation of Gram Sabha is required for granting prospecting license or mining lease for any mineral in the Scheduled Areas. Which of the statements given above is/are correct? (a) 1 only (b) 1 and 2 only (c) 2 and 3 only (d) 1, 2 and 3 ANSWER: (b)”