Ultimate Assessment Program 2027/28/29 || 1:1 Mentorship Batch Admissions Open

Search results for: “”

  • New deal

    Why in the News

    The 31st Conference of the Parties (COP31) to the United Nations Framework Convention on Climate Change (UNFCCC) has opened in Antalya, Türkiye, with Türkiye as host and Australia presiding over the negotiations. Its main task is to deliver finance already promised, not to set new targets. Several prominent world leaders, including Europeans, have skipped the meeting.

    What is COP31 expected to deliver?

    1. What a COP is: A COP is the yearly meeting of UNFCCC member countries to negotiate cutting emissions and paying for climate action. It is like the annual general meeting of the climate treaty.
    2. Island focus: Ministerial delegations visited Fiji and Tuvalu before the summit, since small island nations are most vulnerable to warming.
    3. Finance goal: The main concern is delivering $300 billion a year by 2035, the climate finance goal decided at COP29 in Baku.
    4. Adaptation finance: COP30 called for tripling adaptation finance, money that helps countries cope with climate impacts, over the same period. How the funds will actually flow has been deferred to COP32.
    5. The takeaway: COP31 will be judged on whether money already promised reaches developing countries.

    Why are the science and the fossil fuel agenda stalling?

    1. Global stocktake: The second global stocktake, a periodic check on collective progress under the Paris Agreement, begins at COP31.
    2. IPCC delay: The Intergovernmental Panel on Climate Change (IPCC) has not settled a timeline for its next reports. These reports give policymakers the scientific push to keep warming below 2°C, and ideally 1.5°C.
    3. No formal fossil fuel roadmap: COP30 ended without a formal roadmap away from fossil fuels, a step back from the consensus reached at COP28 in Dubai.
    4. Voluntary roadmap: A voluntary roadmap exists but sits outside the formal negotiating text, so it binds no country.

    Why is climate money scarce?

    1. Competing pressures: Three pressures have squeezed the funds available:
      • the West Asia war;
      • the withdrawal of the United States (US) from the Paris Agreement;
      • financial strain across Europe.
    2. Loss and damage example: The Loss and Damage fund recently approved $21 million for Nepal, when the need runs into billions.

    Why did India refuse the electrification pledge?

    1. Electrification target: The COP31 President has set a target to raise electricity’s share of total energy consumption to 35% by 2035.
    2. Starting point: Electricity now meets 23% of total energy consumption, so the target needs a fast shift from direct fuel use in industry, transport and homes to power.
    3. India’s refusal: India has refused to sign the pledge. It insists on three conditions:
      • predictable climate finance, money developing countries can plan around;
      • technology transfer, clean technology shared by developed countries;
      • nationally determined approaches, each country choosing its own path to cut emissions.
    4. Delivery before ambition: New targets without the promised finance shift the cost of transition onto developing countries.

    Challenges

    1. Unclear delivery channels: No agreed mechanism yet decides who pays and through which channel, so the finance goal remains a promise.
    2. Leadership vacuum: The absence of top leaders and the US exit weaken political pressure on major emitters.
    3. Science timeline: Without a fixed IPCC schedule, the stocktake lacks fresh science to push countries towards higher ambition.
    4. Fossil fuel ambiguity: A roadmap outside the formal text lets countries expand fossil fuel use without breaching any commitment.

    Way Forward

    1. Finance delivery plan: Agree a delivery plan for the finance goal at COP31, with yearly milestones and a grant share.
    2. Adaptation baseline: Set a baseline and annual reporting to track progress on tripling adaptation finance.
    3. Replenished fund: Developed countries should replenish the Loss and Damage fund so that grants match the scale of disasters.
    4. IPCC calendar: Fix the IPCC report calendar so that the second stocktake draws on current science.
    5. Supported sectoral goals: Keep sectoral goals such as electrification voluntary, and back them with finance and technology for developing countries.

    Conclusion

    The credibility of COP31 rests on delivering money already promised, not on new targets that developing countries cannot fund. The test to watch is whether this meeting fixes how climate finance flows or postpones the question again.

    Back2Basics: Fund for Responding to Loss and Damage

    1. What it is: A dedicated fund that pays for climate damage that has already happened and can no longer be adapted to.
    2. Distinct role: It is separate from mitigation funds, which cut emissions, and adaptation funds, which prepare for future impacts.
    3. Origin: It was established at COP27 in 2022 and operationalised at COP28 a year later.
    4. Host: It is temporarily hosted by the World Bank.

    Matching Previous Year Question

    “[2021, GS3, 15 marks] Describe the major outcomes of the 26th session of the Conference of the Parties (COP) to the United Nations Framework Convention on Climate Change (UNFCCC). What are the commitments made by India in this conference?”

  • India and U.K. are turning climate ambition into action

    India and U.K. are turning climate ambition into action

    Why in the News

    India and the United Kingdom (U.K.) present their climate partnership as a move from targets to delivery. The largest ever Earthshot Prize edition is held in Mumbai next week, as the 31st Conference of the Parties (COP31) to the United Nations (UN) climate convention meets in Türkiye. The test is whether capital and policy certainty follow the ideas.

    What is the Earthshot Prize, and why is it in India?

    1. What it is: Founded by the Prince of Wales and launched in 2020, the Earthshot Prize rewards environmental solutions that can work at scale, like a global innovation contest.
    2. Prize money: Five winners will each receive £1 million to accelerate their work.
    3. India’s record: India has produced more finalists and winners than any other country: nine finalists, including four winners.
    4. The takeaway: The Mumbai edition puts India’s role in clean growth and climate innovation on display.

    Why is faster climate action urgent, and what shows it can work?

    1. Montreal Protocol: Under the Montreal Protocol, a global treaty, governments, companies, scientists and non governmental organisations together phased out almost all ozone depleting substances. The ozone layer is on track to recover within decades.
    2. Worsening crisis: El Niño, a periodic Pacific warming that disrupts weather worldwide, and conflict driven energy shocks have worsened the climate crisis this year.

    Where do India and the U.K. stand on clean energy?

    1. India’s capacity milestone: Non fossil sources now account for more than half of India’s installed power capacity, five years ahead of its 2030 target.
    2. India’s global role: India aims for 500 gigawatts of non fossil capacity by 2030. It shapes the global response through the International Solar Alliance (ISA) and the Coalition for Disaster Resilient Infrastructure (CDRI).
    3. U.K. record: The U.K. has cut its greenhouse gas emissions by more than half since 1990 and kept its economy growing.

    How do the two countries cooperate on energy and finance?

    1. Regulators and offshore wind: India’s Central Electricity Regulatory Commission (CERC) and the U.K.’s Office of Gas and Electricity Markets (Ofgem) cooperate on electricity market reform. A joint taskforce supports offshore wind in India.
    2. Shared learning: The U.K. was partner country at the Bharat Renewable Energy Summit and Expo 2026, and it is learning from India’s energy stack on how to share data.
    3. Climate Finance Initiative: The two governments launched the India-U.K. Climate Finance Initiative last year to scale climate investment.
    4. Capital portfolio: A £330 million U.K. portfolio, run with the Government of India, has drawn in more than £3.5 billion for green businesses and start ups.
    5. British International Investment (BII): The U.K.’s development finance institution has backed more than 600 businesses and committed $1.1 billion to climate investments in India, its largest market.

    Why is climate also treated as a security issue?

    1. Climate as security: At the UN General Assembly in September, the U.K. Foreign Secretary jointly convened foreign ministers on climate and nature as national security challenges.
    2. Disaster risk reduction: India and the U.K. jointly chaired the UN Disaster Risk Reduction Senior Officials’ Meeting in New Delhi in October.
    3. Sovereign disaster risk pool: India’s National Disaster Management Authority (NDMA) and the U.K.’s Centre for Disaster Protection are assessing a sovereign disaster risk pool, a shared insurance fund that pays governments quickly after a disaster.

    Challenges

    1. Scale of finance: Portfolios of hundreds of millions of pounds are small against the investment India’s non fossil target needs.
    2. Capacity versus generation: Installed capacity overstates the transition, since coal still produces most of India’s electricity.
    3. Policy certainty: Innovators scale only with predictable policy, so shifting rules deter long term investors.

    Way Forward

    1. Blended finance: Use public portfolios to draw larger private capital into grids, storage and electric transport.
    2. Risk pool decision: Complete the feasibility study on the risk pool and settle its design and funding.
    3. Route to scale: Link Earthshot finalists to investors and public procurement so their solutions reach scale.

    Conclusion

    India and the U.K. have built a working climate partnership across regulation, finance and disaster risk. Whether its finance and policy certainty grow to match their targets is the test COP31 will sharpen.

    About India-U.K. Relations

    1. Trade agreement: The Comprehensive Economic and Trade Agreement (CETA) came into force in July 2026, with zero duty access for 99% of Indian exports to the U.K.
    2. U.K.-India Vision 2035: Adopted with the signing of the CETA in July 2025, this ten year agenda covers trade, technology, defence and education, with climate and clean energy central to it.

    Matching Previous Year Question

    “[2022, GS3, 15 marks] Do you think India will meet 50 percent of its energy needs from renewable energy by 2030 ? Justify your answer. How will the shift of subsidies from fossil fuels to renewables help achieve the above objective? Explain.”

  • In a dilemma

    Why in the News

    Former Bangladesh Prime Minister Sheikh Hasina has applied for a new passport and national identity card and plans to return home in December. Dhaka has rejected the request. Her planned return has stalled India-Bangladesh ties and left India in a dilemma.

    Who is Sheikh Hasina, and why does her return matter?

    1. Exile in India: Sheikh Hasina led the Awami League government that a youth led uprising overthrew. She took refuge in India on 5 August 2024.
    2. Death sentence: A tribunal in Bangladesh has convicted her of ordering a crackdown on thousands of students and sentenced her to death.
    3. Earlier exile: She lived in exile in India from 1975 to 1981, after her father Sheikh Mujibur Rahman and most of her family were assassinated.
    4. Return plan: She plans to return to argue her case and rebuild the Awami League, which faces a bipartisan (cross party) push in Bangladesh to ban it from politics.
    5. The takeaway: India’s honoured guest faces a death sentence at home, so her travel plan is now a foreign policy problem for New Delhi.

    How has Dhaka responded to her passport request?

    1. The application: A London based law firm acting for her wrote to the Bangladesh High Commission in New Delhi on 9 November.
    2. Dhaka’s refusal: The Foreign Affairs Adviser to Prime Minister Tarique Rahman said Dhaka would not grant a passport to a “terrorist”.
    3. Extradition route: Dhaka will instead seek her return under its extradition agreement with India, which provides for handing over wanted persons. It calls this a “prisoner transfer process”.
    4. Government’s bind: The Bangladesh Nationalist Party (BNP) government is unlikely to want her back. It would then have to begin execution proceedings and face international opposition.
    5. Pressure from the opposition: The government’s inaction strengthens the opposition Jamaat-e-Islami, which accuses the government of going soft on her.

    How has the rift hurt India-Bangladesh ties?

    1. Press conference fallout: India let Hasina hold a virtual press conference in Delhi on 5 August, where she criticised Prime Minister Rahman. His visit to India was then cancelled.
    2. Consular dialogue postponed: The India-Bangladesh consular dialogue, due in Dhaka on 17 and 18 November, has been postponed over her announced return.
    3. Lost agenda: It was to cover border management, visa procedures and the repatriation of detained citizens.
    4. Water talks stalled: Talks on extending the Ganga Waters Treaty, 1996, which expires next month, have stalled because of the rift.
    5. Visa recovery at risk: India cut visas for Bangladeshis sharply after August 2024 and has raised them since Rahman’s election in February. The rift puts this recovery at risk.

    Why is India caught in a dilemma?

    1. No power to restrain: India cannot physically stop its honoured guest from flying to Dhaka or crossing the land border at Petrapole, nor can it disown responsibility for her fate once she crosses.
    2. Two goals in tension: India must rebuild ties with the government in Dhaka and also ensure Hasina’s welfare. The first needs distance from her, and the second needs continued protection.

    Challenges

    1. Extradition request: A formal extradition request would force India to choose between a treaty partner and a former leader it shelters.
    2. Little room in Dhaka: Pressure from the Jamaat-e-Islami leaves the BNP government little political room to soften its stand on Hasina or ease ties with the country sheltering her.
    3. Unrest on return: Her return carries a risk of protests and violence in Bangladesh, which would turn opinion further against India as her host.

    Way Forward

    1. Separate tracks: Keep water, border and visa talks apart from the Hasina question, starting with a fresh date for the consular dialogue.
    2. Interim water deal: Use the Joint Rivers Commission (JRC), the two countries’ joint body on shared rivers, to agree an interim extension of the treaty before it lapses.
    3. Assurances on due process: Seek Dhaka’s assurances on her safety and a fair legal process before she travels.

    Conclusion

    India’s protection of Hasina and its need for working ties with Dhaka’s new government now pull in opposite directions. Her planned return and the lapse of the water sharing treaty are the decision points to watch.

    Back2Basics: Ganga Waters Treaty, 1996

    1. Term: India and Bangladesh signed it in December 1996 for 30 years, with no automatic extension clause.
    2. Lean season sharing: It divides the dry season flow of the Ganga at Farakka, from January to May, in ten day cycles.
    3. No arbitration clause: Disputes go first to a Joint Committee, which records flows at Farakka and Hardinge Bridge. They then go to the JRC and the two governments, never to an external forum.

    Matching Previous Year Question

    “[2013, GS2, 10 marks] The protests in Shahbag Square in Dhaka in Bangladesh reveal a fundamental split in society between the nationalists and Islamic forces. What is its significance for India?”

  • India’s TB incidence missing from 2026 report of WHO

    India’s TB incidence missing from 2026 report of WHO

    Why in the News

    India carries nearly a quarter of the world’s tuberculosis (TB) cases, yet this year’s World Health Organization (WHO) Global TB Report carries no estimate of India’s TB incidence. WHO says India’s estimates await district level surveillance data and should be updated in early 2027. India has also not released its own annual TB report.

    What is TB incidence, and why does the estimate matter?

    1. What it is: TB incidence is the estimated number of new TB cases in a year, including those never diagnosed. Notified cases count only the patients the health system records.
    2. Undiagnosed gap: The gap between estimated incidence and notified cases is treated as the number of undiagnosed, untreated patients, who keep spreading the infection.
    3. Missing national report: India’s own annual TB report, usually released in March on World TB Day, carries detailed State level data.
    4. The takeaway: Without an incidence estimate, India cannot show how many TB patients its programme is still missing.

    Why is India’s estimate under review?

    1. District survey: Instead of a national survey, the government measured TB prevalence in 50 randomly selected, representative districts in 2025.
    2. Comparability check: WHO says the results must first be checked against the 2020-21 national prevalence survey, then adjusted and released.
    3. Past surveys: India’s incidence estimates rested on two national surveys, in 1955-58 and 2020-21.
    4. Repeatable method: A national survey is superior but costly, so even China has done only three. A district survey can be repeated more often.
    5. Likely lower estimate: An expert expects the new method to lower India’s incidence, partly because the programme works.

    What does the report show for India?

    1. Diagnosed cases: The national programme diagnosed 25.3 lakh people in 2025, down from 26.18 lakh a year earlier.
    2. Deaths: Reported TB deaths fell to 2.63 lakh in 2025 from just over 3 lakh a year earlier.
    3. Programme measures: The National TB Elimination Programme (NTEP) credits Artificial Intelligence (AI) enabled X-rays, rapid diagnostics, differentiated care, and nutrition support through Ni-kshay Poshan Yojana and Ni-kshay Mitra donors.
    4. Domestic funding: Domestic resources meet 96% of TB programme funding needs.
    5. Treatment success: 94% for drug susceptible TB, the form that responds to standard drugs.

    Is India on track to end TB?

    1. Mortality fall: India’s TB mortality has fallen 38% since 2015, against a global decline of 35%.
    2. Milestone five years late: India has now crossed WHO’s milestone, a 35% cut in deaths from the 2015 level, five years after its 2020 deadline.
    3. 2025 target missed: The target for 2025 was a 75% cut in TB deaths.
    4. Global picture: About 10.6 million people fell ill with TB worldwide in 2025, far from the goal of eliminating it.

    Challenges

    1. Hidden cases: Undiagnosed patients spread TB without entering notified data.
    2. Drug resistant TB: Multidrug resistant TB, which does not respond to the main TB drugs, remains a crisis and a health security threat.
    3. Catastrophic costs: About half of TB affected households worldwide spend over 20% of household income on the illness.

    Way Forward

    1. Publish revised estimates: Release the district survey based estimates on schedule, with the method explained.
    2. Restore the annual report: The Ministry of Health and Family Welfare should resume the annual India TB report with State level data.
    3. Regular district surveys: Repeat district prevalence surveys at fixed intervals to track trends.

    Conclusion

    India’s TB deaths have fallen faster than the global average, but without an incidence estimate the size of its hidden epidemic is unknown. Whether the revised estimate shows the programme reaching the patients it now misses is the thing to watch.

    Key numbers

    1. Global TB deaths: 1.13 million in 2025 (WHO).
    2. Concentration: About 88% of new cases in 30 countries; India about a quarter, Indonesia 10%.
    3. Regional shares, 2025: South-East Asia 35%, Western Pacific 27%, Africa 25% of new cases.
    4. TB Mukt Bharat Abhiyaan: Over 25 crore people screened, 7 December 2024 to 8 November 2026.

    Back2Basics: End TB Strategy

    1. About: A WHO strategy adopted by the World Health Assembly in 2014 to end the global TB epidemic.
    2. 2030 targets: A 90% cut in TB deaths and an 80% cut in incidence, compared with 2015.
    3. Cost target: No TB affected family should face catastrophic costs from the disease.
    4. India’s goal: India set itself the goal of ending TB by 2025, five years ahead of the Sustainable Development Goal deadline of 2030.

    Matching Previous Year Question

    “No direct PYQ traced in the provided files. Thematic PYQ: [2024, GS2, 15 marks] In a crucial domain like the public healthcare system, the Indian State should play a vital role to contain the adverse impact of marketisation of the system. Suggest some measures through which the State can enhance the reach of public healthcare at the grassroots level.”

  • The SIR exercise is also a technology failure

    Why in the News

    The 2025-26 Special Intensive Revision (SIR) of electoral rolls is the first revision of this scale run through a centralised digital platform, and the technology itself has become a source of exclusion. Debate has centred on the Election Commission of India (ECI), its document list and the burden on voters. As a digital project, the SIR skipped the testing behind India’s successful public platforms.

    Why is the SIR’s technology record an irony?

    1. What it is: India presents itself as a leader in digital public infrastructure, shared digital systems that serve the whole population. Eg. Railway ticketing, income tax e-filing, Aadhaar, the Unified Payments Interface (UPI) and DigiLocker.
    2. Built over years: Those systems came from years of piloting, iteration and published specifications, disciplines the SIR omitted.
    3. Central platform: ERONet, the ECI’s roll management platform, generated notices centrally. An unpublished rule coded into it decides who must appear for a hearing.
    4. The takeaway: In the most basic democratic process, untested software excluded citizens whom India’s own technology record could have protected.

    What were the five technology failures?

    1. Rigid discrepancy flags: ERONet issued “logical discrepancy” notices using filters such as the parent child age gap and children per parent. Ages on Indian rolls are often approximate, so such rules misfire.
      • Uneven impact: Family size checks on Delhi’s draft roll flagged Muslim electors at a markedly higher rate, The Hindu found.
    2. Unvalidated name matching: West Bengal’s 2002 Bengali rolls were rendered into English, reportedly by machine, garbling many names. Over 1.3 crore entries were flagged, and name variations made up more than half of the discrepancy cases.
    3. Features changed mid operation: De-duplication software, which flags people holding two voter IDs, was switched back on in some States. The ECI had told the Supreme Court in late 2025 it was unreliable.
      • Relative mapping: A new algorithm checking how voters are “mapped” to relatives on the old roll forced Booth Level Officers (BLOs) to redo completed work.
    4. Rules by video: New ERONet options in October let Electoral Registration Officers (EROs) close notices without hearings. Videos and WhatsApp groups, not written orders, explained them.
    5. Forms drifted from law: The online Form 6, the application for a new voter, carried a parent and grandparent declaration that applicants could not skip. The Supreme Court said it never approved that change.

    Why does it matter that code decided the rules?

    1. “Code is law”: Legal scholar Lawrence Lessig warned over two decades ago that “code is law”. In the SIR, rules written into software decided what statute did not.
    2. Opaque rules for officers: BLOs and EROs, the roll’s statutory custodians, implement decisions they cannot see. Citizens have no written rule to cite on appeal.
    3. Legality unsettled: The Supreme Court has not ruled on the logical discrepancy category’s legality, allowing it in West Bengal only as an interim arrangement.
    4. Time set by the poll calendar: Enumeration in Tamil Nadu and West Bengal ran about six weeks before April polls. West Bengal’s final roll still marked over half a crore names “under adjudication”.

    Challenges

    1. No pilots: Name matching across scripts is a known difficulty, yet it reached lakhs of households unpiloted.
    2. No change freeze: The live system kept changing, so untested features reached officers.
    3. Centralised control: The platform took from EROs the discretion to decide which flagged cases need a hearing.

    Way Forward

    1. Test discrepancy filters: The ECI should test discrepancy filters on real roll data before issuing notices.
    2. Written procedures first: Issue written Standard Operating Procedures (SOPs) before training officers.
    3. Align forms with statute: Keep digital forms identical to the statutory forms.

    Conclusion

    The SIR shows that software can quietly replace the law in deciding who stays on the electoral roll. Whether these failures were foreseen and ignored, or never foreseen, remains open, and neither answer reassures voters.

    What is a Special Intensive Revision?

    1. About: A time bound, house to house re-enumeration of the roll. Every voter fills a fresh form, which BLOs verify at the door.
    2. Legal basis: Article 324 gives the ECI control over electoral rolls. Section 21(3) of the Representation of the People Act, 1950 lets it order a special revision at any time, for reasons recorded.
    3. Procedure: The Registration of Electors Rules, 1960 fix the draft roll, claims and objections, and notice and hearing before deletion. The ERO decides every inclusion and deletion.
    4. Rarely used: Intensive revisions were carried out 13 times between 1952 and 2004, the last in 2002 to 2004.

    Matching Previous Year Question

    “[2026, GS2, 10 marks] Is the right to vote a fundamental right? Discuss the position of the Election Commission of India while undertaking the revision of electoral rolls. Can it also examine the question of citizenship of voters?”

  • 6 years on, PLI schemes disbursal 18.5% of total outlay: NITI Aayog

    Why in the News

    Six years after 14 Production Linked Incentive (PLI) schemes were notified, only 18.51% of their Rs 1.91 lakh crore outlay has actually been paid out as incentives. An impact assessment by the NITI Aayog and the Indian Institute of Management (IIM) Ahmedabad finds that nine schemes have disbursed less than a tenth of their outlay. The report credits the scheme’s performance linked design, but critics question how much real manufacturing it has built.

    What is the PLI scheme, and why is disbursal slow?

    1. What it is: A PLI scheme pays manufacturers a cash incentive only after they meet set targets for investment, production and other criteria. It works like a sales bonus paid after the target is hit.
    2. Sectors covered: The 14 schemes notified in 2020 cover sectors such as pharmaceuticals, textiles, automobiles, steel and electronics.
    3. Back loaded by design: Incentives are paid only after firms hit their targets, never in advance, and some schemes started later than 2020. Disbursals should rise as firms expand capacity and meet progressively higher thresholds.
    4. The takeaway: A low payout can mean firms have not yet hit their targets, so disbursal alone does not show whether the scheme works.

    Which schemes have paid out, and which have lagged?

    1. Top performers: Drones and drone components have disbursed 77.50% of outlay and large scale electronics manufacturing 55.83%. Both are also top performing export sectors.
    2. Middle group: Pharmaceutical drugs have reached 44.39% and food products 24.89%.
    3. Nine laggards: Nine schemes, including bulk drugs, automobiles and textiles, have disbursed under 10% of their outlays.
    4. Lowest payouts: Bulk drugs (key starting materials, drug intermediaries and active pharmaceutical ingredients) stand at 1.27% and IT hardware 2.0 at 0.57%.

    What has the scheme delivered so far?

    1. Investment: By March 2026 the schemes had attracted Rs 2.40 lakh crore of investment.
    2. Output: The schemes have generated production worth Rs 22.66 lakh crore.
    3. Jobs: The schemes have created employment for over 8.49 lakh people.
    4. Segments on track: Nearly 70% of targeted segments are broadly on track, with the strongest outcomes in electronics, telecom and pharmaceutical drugs.

    Is the PLI scheme building lasting manufacturing?

    1. Import surge: Critics say the electronics scheme, considered a success, has also caused a sharp surge in imports.
    2. Assembly, not depth: The rise in mobile phone manufacturing is largely assembly of imported parts and adds little to employment.
    3. Supply push design: In its current form the scheme is largely “supply driven“, rewarding firms for producing more. Long term sustainability also needs demand side support, which raises buyers’ demand for what firms make.

    Challenges

    1. Uneven sector response: Sectors differ in how fast they adopt technology, how long projects take to start producing, global competition and capital needs, so one uniform design fits some poorly.
    2. Inconsistent data: Ministries collect revenue and employment data in different ways, so outcomes cannot be compared reliably.
    3. Fiscal cost back loaded: Because payment follows performance, the bulk of the government’s spending on the schemes falls in their later years, when budgets must absorb it.

    Way Forward

    1. Sector specific design: Shape each future scheme around its sector’s constraints instead of one uniform approach.
    2. Demand pull: Add demand pull mechanisms alongside supply side incentives in the next generation of such schemes.
    3. Standard data: Standardise revenue and employment data collection across ministries urgently.
    4. Long term review: Shift assessment from the scheme’s initial success to strengthening its long-term effectiveness.

    Conclusion

    The PLI schemes have drawn investment and production, but slow and uneven payouts show how differently sectors have responded. Whether the next generation of schemes adds demand pull and sector specific design is the thing to watch.

    Key numbers

    1. Telecom and networking products: 22.59% of outlay disbursed (NITI Aayog, data till March 2026).
    2. White goods (ACs and LED) and automobiles: 9.29% and 9.20% disbursed.
    3. Speciality steel and textiles (MMF and technical textiles): 3.73% and 3.61% disbursed.
    4. ACC battery and high efficiency solar PV modules: Listed in the report’s chart with no disbursal figure.

    Matching Previous Year Question

    “[2025, GS3, 15 marks] Discuss the rationale of the Production Linked Incentive (PLI) scheme. What are its achievements? In what way can the functioning and outcomes of the scheme be improved?”

  • Green jobs can fill the gaps in the growth story

    Why in the News

    India’s next task is to turn its fast fall in poverty into better jobs, increasingly green jobs. An assessment by the International Forum for Environment, Sustainability and Technology (iFOREST), titled *India’s Green Jobs Moment*, estimates that clean economy sectors could support over 1.3 crore jobs by 2035. The gap is skilling: too few people are trained, and most courses are too short.

    What are green jobs, and where will they come from?

    1. What it is: Green jobs are paid work in activities that cut emissions or help communities cope with climate change. Eg. installing rooftop solar panels or repairing an electric vehicle.
    2. Why now: India’s goals of Viksit Bharat (a developed India) by 2047 and net zero (cutting emissions to what is absorbed) by 2070 are creating new industries.
    3. Growth sectors: Renewable energy, storage, electric vehicles (EVs), green hydrogen, recycling and nature based solutions that strengthen climate resilience.
    4. Local and rural work: Rooftop solar, EV repair and recycling are local by nature, and agroforestry and mangrove restoration jobs are largely rural.
    5. The takeaway: Green jobs can reach households that have just crossed the poverty line, because much of the work sits in towns and villages.

    Why is India well placed to build a green workforce?

    1. Poverty decline: The World Bank counts India’s poverty decline among the world’s fastest, driven above all by rising employment and more women in paid work.
    2. Better educated youth: Young Indians are better educated than before.
    3. Employed workforce: The worker population ratio, the share of people employed, is just 1.9 percentage points below the share working or seeking work, so almost every job seeker finds some work.
    4. Transferable skills: About 71% of thermal power roles assessed can shift to renewables and green hydrogen. About 90% of automobile roles can move into EVs, often after a short bridge course.

    Where does skilling fall short?

    1. Thin technical base: Only 5.3% of young people have technical education, and 5% have formal vocational training.
    2. Demand outpaces training: Direct employment in key green sectors is projected to grow by about 4.5 lakh jobs a year. Dedicated green programmes have trained only around 81,000 people.
    3. Short courses: About 43% of formally trained workers completed courses of under six months. Advanced green roles need deeper technical knowledge.

    What can the existing training system build on?

    1. ITI network: India has over 15,000 Industrial Training Institutes (ITIs), vocational schools for trades such as electrician, with more than 26 lakh seats.
    2. PM-SETU: The Pradhan Mantri Skilling and Employability Transformation through Upgraded ITIs (PM-SETU) scheme is modernising 1,000 government ITIs.
    3. Policy revision: The Ministry of Skill Development and Entrepreneurship (MSDE) is revising the National Policy for Skill Development and Entrepreneurship, the base for green skilling.

    Challenges

    1. Missing green laboratories: Institutes lack laboratories for solar, battery and hydrogen trades.
    2. Instructor shortage: Few instructors know green technologies, so new courses cannot scale quickly.
    3. Disconnected pathway: School, technical and vocational training and the workplace run as separate tracks, so learners cannot progress smoothly.

    Way Forward

    1. Green laboratories in ITIs: Use the PM-SETU upgrade to equip government ITIs with green laboratories.
    2. Instructor training: Train ITI instructors in renewable energy, storage and EV technologies.
    3. Longer programmes: Offer longer, high value programmes alongside short courses and apprenticeships.
    4. Education continuum: Use the revised skilling policy to link school, technical and vocational training and the workplace.

    Conclusion

    India has the young workforce and transferable skills that green industries need, but its training system is too thin and too short to supply them. Whether the revised skilling policy builds a school to workplace continuum is the thing to watch.

    Key numbers

    1. People out of poverty: About 496 million Indians, 2011 to 2023 (World Bank).
    2. Extreme poverty share: 27.1% (2011) to 2.6% (2023) (World Bank).
    3. Youth share of population: More than 27% of Indians are aged 15 to 29.

    Schemes and Initiatives for Skill Development

    1. Pradhan Mantri Kaushal Vikas Yojana (PMKVY): The MSDE’s flagship scheme, launched in 2015, for short term skill training and certification of prior learning.
    2. Skill Council for Green Jobs: A sector skill council set up in 2015, promoted by the Ministry of New and Renewable Energy (MNRE) and industry, that sets green job standards.
    3. Suryamitra: A programme of the National Institute of Solar Energy under the MNRE that trains youth as solar photovoltaic technicians.
    4. National Apprenticeship Promotion Scheme (NAPS): Launched in 2016, it shares part of apprentices’ stipends so that employers take on more trainees.

    Matching Previous Year Question

    “[2023, GS2, 15 marks] Skill development programs have succeed in increasing human resources supply to various sectors. In the context of the statement analyze the linkages between education, skill and employment.”

  • Rs 3,230-crore Yuge Yugeen museum with world’s largest display area gets Cabinet nod

    Rs 3,230-crore Yuge Yugeen museum with world’s largest display area gets Cabinet nod

    Why in the News

    The 100 year old North and South Block complex in New Delhi will change from a seat of government offices into the Yuge Yugeen Bharat Museum, a public cultural institution. The Cabinet Committee on Economic Affairs (CCEA), chaired by the Prime Minister, has approved the Ministry of Culture project at Rs 3,230 crore. The museum is planned to have the largest display area in the world.

    What is the Yuge Yugeen Bharat Museum?

    1. What it is: It is a planned museum that will present India’s civilisational journey through curated thematic galleries and exhibitions.
    2. Heritage covered: It will show both tangible heritage (objects and buildings) and intangible heritage (cultural traditions, knowledge systems and artistic practices).
    3. Adaptive reuse: Adaptive reuse means giving an old building a new use and preserving its architectural character. It is like turning an old palace into a hotel without changing its structure.
    4. Timing: Government offices are relocating from the two buildings, which the official statement calls a unique opportunity for reuse.
    5. The takeaway: A century old seat of government becomes a building the public can visit and learn from.

    What has been approved, and on what timeline?

    1. Origin: The Prime Minister announced the project on 18 May 2023.
    2. Appraisal: The Public Investment Board (the Finance Ministry panel that examines large central projects) appraised it on 27 July 2026. The Ministry of Culture concurred with its recommendations.
    3. Phases: Work will run in phases from the current financial year to 2030-31, the tentative completion year.
    4. First gallery: A gallery titled “Adornment” is expected to open to the public in North Block in the latter half of 2027.
    5. Principal architect: The Ministry has engaged Los Angeles based architect Kulapat Yantrasast after a public tender last year.

    What will the museum hold, and how large will it be?

    1. Size: The proposed built up area is about 1,78,509 square metres. Benchmarked against major international museums, its display area will be the largest in the world.
    2. Collection: Around 1.8 million objects have been identified from the National Museum and other Ministry of Culture museums, State museums and private collections.
    3. Site museums: The collection also draws on 52 site museums of the Archaeological Survey of India (ASI), the agency that protects monuments.
    4. Other galleries: Themes include “Architecture and Cityscapes”, “Mathematics and Astronomy”, “Languages and Scripts”, “Faith and Spirituality” and “Bharat Connects: Trade and Ideas”.
    5. Visitors and facilities: It is being equipped for over one crore visitors a year. The project covers collection storage, conservation facilities, visitor amenities, landscaping and intelligent building systems.

    Why does the project matter for heritage and learning?

    1. Preservation with a new role: The project seeks to preserve the architectural and heritage character of the buildings and give them a new institutional role.
    2. Education and research: As a public cultural and educational institution, it will offer opportunities for learning, research and cultural engagement.
    3. Modern museum practice: It will combine contemporary museum practices, immersive technologies and interpretation designed around the visitor.

    Challenges

    1. Old structures: Buildings designed as offices a century ago need climate control and fire safety upgrades that can damage heritage fabric.
    2. Moving the collection: Shifting objects from many museums risks damage and loss of records in transit.
    3. Source museums: ASI site museums and State museums could lose objects that draw meaning from their original location.
    4. Visitor pressure: Very high annual footfall will add wear to heritage interiors.

    Way Forward

    1. Conservation plan: The Ministry of Culture should publish a conservation management plan before structural work begins.
    2. Digital records: Each object should be photographed and catalogued, with its ownership history recorded, before it is moved.
    3. Loans, not transfers: Objects from site museums should come on rotating loan, so that source museums keep their collections.
    4. Timed entry: Timed ticketing should spread visitors across the day to protect interiors.

    Conclusion

    The project is approved and phased work follows, with the first gallery as the next milestone. What to watch is whether the conversion keeps the buildings’ heritage character intact as collections arrive from across the country.

    Matching Previous Year Question

    “[2018, GS1, 10 marks] Safeguarding the Indian art heritage is the need of the moment. Discuss.”

  • Gravitational-wave astronomy is entering its statistical era

    Gravitational-wave astronomy is entering its statistical era

    Why in the News

    Gravitational wave astronomy has moved from studying single black hole mergers to finding patterns across hundreds of them, its “statistical era“. An international collaboration of scientists has released a catalogue of 390 candidate events, 70% larger than the last. The patterns test Einstein’s theory of gravity, but detectors still cannot locate most sources precisely.

    What are gravitational waves, and how are they detected?

    1. What they are: Gravitational waves are ripples in space and time (spacetime), created when very heavy objects such as neutron stars and black holes accelerate rapidly. They resemble ripples on a pond.
    2. Einstein’s theory: The general theory of relativity treats gravity as the curvature of spacetime caused by matter and energy. A change in that curvature travels outward at the speed of light.
    3. Detectors: The waves disturb matter slightly. The twin Laser Interferometer Gravitational Wave Observatory (LIGO) sites in the United States, VIRGO in Italy and KAGRA in Japan sense this.
    4. Chirp and ringdown: Two black holes spiralling together emit a rising signal, the chirp. The merged black hole settles with fading waves, the ringdown, like a struck bell.
    5. The takeaway: Hundreds of signals let scientists study black holes as a population, not one at a time.

    What has changed with the new catalogue?

    1. Single signals to many: Scientists first detected gravitational waves in 2015. A decade of detector upgrades let them study hundreds of mergers together by 2025.
    2. New events: The catalogue, released in May, includes 161 new events, all consistent with merging black holes.
    3. Clearest signal: LIGO detected GW250114, the clearest signal so far, in January 2025.
    4. Earlier statistical eras: Radio astronomy reached this stage in the late 1950s. The Sloan Digital Sky Survey has mapped millions of galaxies since 2000.

    What do the statistics show about black holes and gravity?

    1. Relativity holds: The LIGO collaboration checked 168 signals against the theory’s equations and found no disagreement. The ringdown of GW250114 matched the expected frequencies.
    2. Uneven masses: Black holes near 10 times the sun’s mass are more common than expected. Those near 35 times tend to merge with partners of similar mass.
    3. Spins: Only around 15% of detected black holes spin rapidly, so no single formation route explains all mergers. Routes include twin stars, capture inside star clusters, and repeat mergers.
    4. Missing mass range: Some extremely massive stars blow apart and leave no black hole, so one range of black hole masses is scarce:
      • high frequency light turns into electron and antielectron pairs;
      • core pressure falls and runaway fusion destroys the star;
      • a study puts the range’s lower end near 44 times the sun’s mass.

    How can the method grow, and why does LIGO India matter?

    1. Cosmic expansion: Signal distances, combined with the redshift (stretching of light) of galaxies, give the universe’s expansion rate. This year’s estimate, 71 km/s per megaparsec, is too imprecise to settle open questions.
    2. Locating a source: Scientists compare when a signal reaches each detector, so a distant detector narrows the patch of sky to search.
    3. Best location so far: GW240615 was traced to six square degrees of sky, about 30 times the full moon’s apparent size.
    4. LIGO India: The third LIGO will come up in Hingoli district, Maharashtra, and begin observing in 2030. One study estimated it could cut the average area of uncertainty by 40%.
    5. LISA: The European Space Agency and the National Aeronautics and Space Administration are developing the Laser Interferometer Space Antenna (LISA), three satellites orbiting the sun. It will sense low frequency waves from heavier black holes.

    Challenges

    1. Northern clustering: All four current detectors sit in northern latitudes, so most sources fall in sky areas too large to be useful.
    2. Sensitivity limit: Detectors find only nearby sources and objects above a minimum mass, which gradual upgrades cannot fix.
    3. Few neutron star events: The catalogue favours black holes, so mergers like the 2017 neutron star collision, which telescopes also saw, remain rare.

    Way Forward

    1. LIGO India schedule: The Department of Atomic Energy should keep the Hingoli detector on schedule.
    2. Follow up network: Other telescopes should receive detector alerts and scan a located patch quickly.
    3. Space based detection: The agencies building LISA should complete it to cover waves that ground detectors miss.

    Conclusion

    Gravitational wave astronomy is only beginning its shift from single discoveries to population studies. What to watch is whether new detectors locate sources well enough for other telescopes to follow.

    Key numbers

    1. Precision gain: Expansion estimate around 26% more precise than the previous gravitational wave estimate.
    2. Detector network: Five facilities operate, including GEO600 in Germany; India’s will be the sixth.

    Matching Previous Year Question

    “[2023] Consider the following pairs: Objects in space Description 1. Cepheids : Giant clouds of dust and gas in sapce 2. Nebulae : Stars which brighten and dim periodically 3. Pulsars : Neutron stars that are formed when massive stars run out of fuel and collapse How many of the above pairs are correctly matched? (a) (a)Only one (b) (b)Only two (c) (c)All three (d) (d)None ANSWER: (a)”

  • India raises fertilizer subsidy by 64%, overshoots Budget estimates

    India raises fertilizer subsidy by 64%, overshoots Budget estimates

    Why in the News

    The Union Budget for 2026-27 set aside Rs 54,000 crore to subsidise phosphatic and potassic (P&K) fertilizers, but the approved outgo for the year has crossed Rs 1 lakh crore. The Union Cabinet has approved Rs 62,370.02 crore for the Rabi (winter crop) season, 64% more than last year. The overshoot sets cheap fertilizer for farmers against the fiscal deficit.

    What is the fertilizer subsidy, and how does it work?

    1. What it is: The government pays fertilizer companies part of their cost, so farmers buy fertilizer below its market price. It works like a discount that the government pays for.
    2. Nutrient Based Subsidy (NBS): P&K fertilizers, including Di-ammonium Phosphate (DAP), supply phosphorus and potash to crops. For them, the Centre fixes a subsidy rate for each nutrient: nitrogen, phosphorus, potash and sulphur.
    3. Seasonal approval: The subsidy is allocated separately for the Kharif (monsoon crop) season and the Rabi season.
    4. Urea: Urea has its own Budget allocation. Liquefied natural gas (LNG) is the key input for making it, so gas prices decide its cost.
    5. The takeaway: Farmers’ prices are held down, so any rise in global fertilizer or gas prices falls on the Union Budget.

    What has the Cabinet approved?

    1. Comparison with last year: The Rabi approval compares with Rs 37,952 crore budgeted for last year’s Rabi season.
    2. Period covered: The rates apply from 1 October this year to 31 March next year.
    3. DAP price protection: A special provision continues to keep DAP available to farmers at a fixed Rs 1,350 per bag.
    4. Kharif share: This year’s Kharif season had already taken Rs 41,533.81 crore, so the Rabi approval pushed the P&K bill past its Budget allocation.

    How far has the bill overshot the Budget?

    1. Budget assumption: The Budget cut the total fertilizer subsidy to Rs 1.71 lakh crore, from Rs 1.86 lakh crore the previous year.
    2. Reason given for the cut: The government expected a “reduced requirement for imported urea and P&K fertilizers” and more balanced use of nutrients for soil health and productivity.
    3. Spending pace: Fertilizer subsidy spending in the six months to September crossed 70% of the full year estimate, as per the Controller General of Accounts (CGA), the Centre’s chief accounting office.
    4. Full year outgo: The total outgo is expected to top Rs 3 lakh crore and could reach Rs 3.50 lakh crore.

    Why did the bill rise, and what is the debate?

    1. War shock: The war in West Asia began a few weeks after the Budget of 1 February. The energy shock and the closure of the Strait of Hormuz pushed up global fertilizer prices.
    2. Urea and gas: Global prices of urea and LNG rose after the war began and stayed high for a longer period, which ended the expectation that prices would ease.
    3. Case for a higher subsidy: Food inflation is rising sharply, so the chief economist of Bank of Baroda holds that input costs such as fertilizer must be kept in check.
    4. Fiscal cost: The Bank of Baroda chief economist expects the fiscal deficit to be higher by up to 0.3% of GDP, a rise already factored in.

    Challenges

    1. Import dependence: India imports urea, P&K fertilizers and gas, so global price shocks pass directly into the subsidy bill.
    2. Open ended liability: A fixed price for farmers means the subsidy has no upper limit when global prices rise.
    3. Budget credibility: An estimate built on easing prices was overtaken within months, which weakens the fiscal deficit target.
    4. Nutrient imbalance: Urea stays far cheaper than P&K fertilizers, which encourages overuse of nitrogen and harms soil health.

    Way Forward

    1. Supply contracts: The Department of Fertilizers should sign long term import contracts for urea, DAP and gas to reduce exposure to spot prices.
    2. Balanced use: States should promote soil test based application, so that farmers use nutrients in the right proportion.
    3. Price contingency: The Ministry of Finance should budget a contingency for fertilizer when global prices are volatile.

    Conclusion

    The Rabi subsidy stands approved, and the year’s fertilizer bill is set to end far above the Budget estimate. What to watch is whether global gas and fertilizer prices ease before the next Kharif season.

    Key numbers

    1. Increase over last Rabi: Rs 24,417.73 crore more than the previous Rabi season.
    2. Urea allocation, 2026-27: Rs 1.17 lakh crore within the total fertilizer subsidy budget.
    3. Budget cut from the 2025-26 level: The Centre cut the fertilizer subsidy by over 8%.
    4. NBS spending in the first half of 2026-27: Rs 33,664 crore (Controller General of Accounts).

    Matching Previous Year Question

    “[2020] With reference to chemical fertilizers in India, consider the following statements: 1. At present, the retail price of chemical fertilizers is market-driven and not administered by the Government. 2. Ammonia, which is an input of urea, is produced from natural gas. 3. Sulphur, which is a raw material for Phosphoric acid fertilizer, is a by-product of oil refineries. Which of the statements given above is/are correct? (a) 1 only (b) 2 and 3 only (c) 2 only (d) 1, 2 and 3 ANSWER: (b)”